Electrical installation & renovation

We plan and install electrical systems in flats, houses and businesses. In older buildings we replace outdated wiring and boards without turning the whole flat upside down.

What is included

  • New installation in flats, houses and shops
  • Rewiring and new distribution boards, retrofitting RCDs
  • Additional sockets, switches and circuits
  • Indoor and outdoor lighting, LED upgrades
  • Connections for cookers, ovens and instantaneous water heaters
  • Final inspection with test report

Standards and documents

Work to OVE E 8101. On completion you receive the test report and system documentation for your logbook (Anlagenbuch).

Frequently asked questions

Do all walls have to be opened for a rewire?

Not always. Existing conduits can often be reused or cables run in trunking. We check this during the site visit.

How long does it take to rewire a flat?

A flat of up to about 70 m² usually takes 3 to 5 working days, depending on condition and scope.

Guide prices, net plus 20 % VAT, non-binding. The exact price is in the written quote after a site visit.

All services